Family de Valck

They set to work calmly, moving at a snail’s pace towards the pitch, and continued at that slow pace once there to ensure they didn’t damage anything. They even unhitched the tractor at one point to manoeuvre it into a better position. Once the Concerto 1080 cl was in place, they raised it using air cushions to level it out. Even when they went inside the mobile home, they took off their overalls and work boots to ensure the interior was kept clean. They also connected and checked the water, gas, electricity and drainage systems. And all of this was completed in 6.5 hours.
We say: CRAFTSMANSHIP IS MASTERY!!!!
For anyone still looking for a pitch, our campsite has plenty of space available – please ask at the reception for full details.
Kind regards, the de Valck family